(Greencastle, Ind.) INDOT has started construction on the US 231 storm sewer work on North Jackson St. Northbound traffic and southbound traffic are being controlled by a traffic signal system. Drivers may be delayed by the signals; however, most drivers will not need to detour off of US 231. Truck traffic is asked to use the official detour of US 36, SR 75, and SR 240 or US 40.
Work to install the storm sewer is expected to take four to six weeks. Upon completion of the work, INDOT will remove the traffic signal system and traffic flow will return to normal.
During the work period, the following cross street intersections are closed at US 231:
Drivers are reminded that the College St. to Frazier St. connection to US 231 is closed to through traffic. This route cannot be used to circumvent the construction zone.
Drivers are also reminded that Madison St. is not available for a construction by-pass north of Green Street. At the north end of Madison St., Depot St. is one-way westbound which does not provide access to US 231.
Muffler Connection, Dr. Scamahorn’s Animal Medical Clinic, Indiana Farm Bureau Insurance, and the Putnam County Museum can all be accessed from US 231/North Jackson St. Please note that the Farm Bureau Insurance driveway on Frazier St. is closed.
Keener’s Mower Sales and Humphrey’s Outdoor Power are accessible from North Madison Street. Keener’s via Elizabeth St. and Humphrey’s via Frazier St.
Drivers exiting Muffler Connection, the Animal Medical Clinic and Farm Bureau Insurance are reminded to use the signal buttons to ensure a safe exit from these businesses.
Drivers are urged to use caution and to travel slowly in the construction zone.
Copyright © 2023 The City of Greencastle |
We trust
Distinct
with our Website because of their Unlimited Support,
Client Testimonials, and
Website Maintenance Checklist.